Usually yes, and it is the commonest kind of replacement we do. Size codes have been carried across generations of the range, so a code from decades ago generally still identifies a current product at the same nominal size. What can differ is the frame section, the fixing arrangement and the flashing, which is why the year on the plate matters as much as the code.
Replacing in an existing opening generally
The general position, and what it turns on, is on can a rooflight be replaced in the same opening.
What follows is what is specific to a branded range with a published size system.
Why the codes have held
Because the system was designed to be stable.
A size code identifies a nominal outer frame dimension, and keeping those dimensions constant across generations is what allows a house from the seventies to take a current window without new carpentry.
It is unusual and it is genuinely useful.
What has changed within a code
The section, not the size. Frames have become deeper as glazing has become thicker, so a current unit at the same code can sit differently in the opening and project a little more or less internally.
The difference is small and it shows at the reveal.
The reveal is the usual making good
Expect it, rather than being surprised by it.
Even a perfect code match generally means the plaster line around the window is disturbed, so a replacement is a roofing job followed by a small plastering one.
It is worth agreeing who is doing that before the day.
The brackets
Where an old unit and a current one differ most.
Fixing arrangements have changed over the years, so new brackets go in rather than the old ones being reused, and the timber they fix into is checked as they go.

Whether the flashing can be reused
Sometimes, and it is a judgement on the day.
Where a kit is sound, undisturbed and matched to the same frame size, parts of it can stay. Where it has been dressed over, patched or is a different generation, it is renewed.
A new kit is a modest line against the risk of reusing a tired one.
What the timber underneath decides
The one thing that can turn a swap into a bigger job.
If the trimmers around the opening have taken water from a long standing leak, they are cut out and replaced before a new window goes in.
That case is covered on what happens if the timber underneath has rotted.
Changing the action at the same time
Often worth considering while the roof is open.
A centre pivot can be replaced with a top hung of the same code, which changes how the window opens and can bring a room within the escape requirement.
Same opening, different unit.
Changing the material
The other common upgrade. A lacquered pine unit can be replaced with a coated one at the same code, which suits a bathroom or a window that has been neglected.
Changing the glazing
Where the real performance gain is. A unit from the eighties replaced by a current one at the same size is a substantial thermal improvement, and it is generally the reason people replace a window that still works.
By how much is on will a new rooflight be warmer.
Where the code is no longer made
Uncommon, and it has two answers.
Either a neighbouring code fits within the opening with the difference made up in the trimming, or the opening is adjusted, which is carpentry rather than structure where the change is in height.
Adding a second window at the same time
Worth raising while the access is up.
Scaffold and setting out are the fixed costs of a roof job, so a second unit in an adjacent bay is far cheaper alongside a replacement than on its own.

Whether anybody needs to be told
Generally a replacement in an existing opening is straightforward, and the tests are on does replacing a rooflight need building regulations.
A designated area or a listed building changes that, and that is checked first.
How long it takes
Shorter than a new opening, because the opening exists.
The covering above is lifted, the old unit comes out, the new frame goes in and the courses go back, and a single straightforward swap is usually a day.
What comes out first
The sash, and it makes the rest manageable.
The glazed sash lifts out of the frame before anything is disturbed on the roof, so the weight being handled at height is a frame rather than a frame and a pane, and the same is true in reverse when the new one goes in.
It is why a replacement is a two person job rather than a lifting operation.
Protecting the room below
More important on a replacement than on a new opening.
A replacement usually happens in a finished room with a carpet, a bed and a decorated reveal, where a new opening is often cut into a space that is still a building site.
Sheeting and clearing the area under the window is the first thing done, before anything is lifted off the roof.
Doing several at once
Where the economics change sharply.
Three tired windows on one roof replaced in a single visit share the access, the setting out and the making good, and the third costs considerably less than the first.
It is worth deciding about all of them rather than one at a time.
How we work on a VELUX
We work from a photograph of the plate, confirm the code and the year before ordering, and price the reveal making good in rather than leaving it as a surprise.
The rest is on the VELUX window installation page.
Thinking about this job? We survey across Worthing, West Sussex and the South Downs and give you a fixed price before any work starts, with a 10-year workmanship guarantee.