Sun Tunnel Installation

How long does a sun tunnel take to fit?

Half a day to a day for a straightforward run on an accessible roof. The reason it is so much quicker than a rooflight is that there is nothing structural to do: no joists cut, no trimming designed, no reveal formed and no plastering. The ceiling is cut with a hole saw and the diffuser trim covers the edge.

How long a rooflight takes

The variables common to any roof job are on how long does a flat roof rooflight take to install.

What follows is what a light pipe removes from that.

What it does not involve

Almost all of what makes a rooflight a project.

No structural opening, no designed trimming, no room open to the sky, no plastered reveal and no drying time before decoration.

Setting out

The first half hour, and it decides the result.

The ceiling position is agreed, the route is checked from the loft, and the roof position is marked from inside so the tube runs straight.

Why marking from inside matters

Because the run is what matters, not the roof.

Working from the ceiling position upward gives a straight tube, where choosing a convenient tile from outside gives a bend nobody needed.

Why bends cost is on can a sun tunnel go round a corner.

Opening the roof

An hour or so. A few tiles or slates come off, the underlay is cut and the collar formed, and the roof unit is set and flashed into the covering.

The flashing

Where the care goes. A kit matched to the covering is dressed under the courses above and over those below, and the courses are set back so they run true.

Cutting the ceiling

Minutes, with a hole saw. A circular opening is cut from below, and where it falls across a joist that is trimmed as ordinary carpentry rather than as an alteration.

The tube

Assembled in the loft. Sections are joined, taped and set between the roof unit and the ceiling ring, and on a short run that is a straightforward half hour.

A small circular sun tunnel dome on a plain tiled roof slope, and the rigid reflective tube running away beneath it, photographed from the roof
Insulating and sealing it

Insulating and sealing it

The stage worth not rushing. The tube is insulated where it crosses the loft and sealed at the ceiling, and skipping either is what produces problems later.

Why is on do sun tunnels cause condensation.

The diffuser

The last ten minutes. The trim goes in, covers the cut edge and holds the diffuser, and at that point the room is finished and usable.

What making good involves

Very little. The trim covers the cut, so there is generally no filling or plastering, though a repaint of the ceiling is often wanted afterwards.

What extends it

The access, first. A bungalow reachable from a tower and a two storey roof needing a scaffold are the same kit and very different days.

What extends it, second

The covering. Setting hand made clay or natural slate back around a flashing takes considerably longer than concrete interlocking tiles, and breakages have to be matched.

What extends it, third

The loft. A cluttered or fully boarded loft has to be cleared and reinstated, and an obstruction in the route means rethinking the position on the day.

What to look for is on can a sun tunnel go through a loft.

What a homeowner can do

Clear the loft, and the room. A cleared route and a clear floor under the diffuser position is the difference between starting at nine and starting at half past ten.

Dust

Modest, and it is worth preparing for.

Cutting a ceiling drops plaster dust and loft debris, so the area is sheeted and the furniture moved before anything is cut.

A circular ceiling diffuser at the foot of a sun tunnel in a plain white hallway ceiling, even soft light coming through it
Adding a light kit

Adding a light kit

Adds an electrician rather than a day.

The fitting goes in with the tunnel, and getting a switched supply to it is separate work, quick where an existing light was in the same position.

What is involved is on can you get a sun tunnel with a light.

Two or three on one visit

Far less than the sum. Access, setting up and protection happen once, so a second tunnel is a couple of hours rather than another day.

Weather

Matters for a short window. The roof is open for an hour or two rather than a day, so a sun tunnel is far less weather dependent than a rooflight installation.

Doing it with other roof work

The sensible way to buy one. Where a scaffold is up for anything else, a sun tunnel is an hour of extra work rather than a job with its own access cost.

The economics are on how much does a sun tunnel cost.

When the room is usable

Immediately.

Unlike a rooflight, there is no plaster to dry, so the room is finished when the diffuser goes in and the dust sheets come up.

What happens if the position has to move

Decided in the loft, before anything is cut.

Where an obstruction appears, the diffuser shifts within the ceiling to find a clear route, and that is agreed with the household rather than settled unilaterally on the roof.

Half a metre either way rarely matters in a hallway and it can save a bend.

What is left behind

Very little.

Offcuts of tube, a few tiles and the dust from the ceiling cut, and the loft insulation packed back where it was disturbed.

Handover

Two minutes, and worth having.

Where the tube runs, how to clean the diffuser, and that the dome wants clearing when the gutters are done, is the whole of what an owner needs to know.

How we set it out on a sun tunnel

We set out from the ceiling upward and check the loft before anything is cut, because a straight tube is worth more than a convenient roof position and it costs nothing to get right.

The whole picture is on the sun tunnel installation page.

Thinking about this job? We survey across Worthing, West Sussex and the South Downs and give you a fixed price before any work starts, with a 10-year workmanship guarantee.

Get a fixed quote

Get a fixed quote

Tell us about the roof. We will tell you the price.

A survey costs you nothing and there is no obligation attached to it. We look at the roof build-up, the exposure and the opening, and give you one fixed figure, not an estimate that moves once work starts.

If your rooflight is leaking now, say so and we will prioritise the survey.

  • Fixed price, confirmed in writing
  • 10-year workmanship guarantee
  • Installed to current Building Regulations
  • Your roof is never left open overnight
Call Get a fixed quote