Rooflight and Skylight Installation in Cowfold
- Fixed quote before we start
- Roof never left open overnight
- 10-year workmanship guarantee
- Fixed quote before we start
- 10 years workmanship guarantee
- 25 years fitting rooflights
- Skylights only, not a general roofer
Cowfold sits where two main roads cross, and its older buildings carry the material that gives this part of the Weald its character: weatherboard. Painted or tarred boarding over timber frame, on houses and on outbuildings, and it behaves quite unlike any other cladding we work near. Almost everything that goes wrong around it comes from treating it as a wall.
What weatherboard is
Worth describing properly, because it is repeatedly treated as a solid elevation and it is not one.
Weatherboard is a skin of overlapping horizontal timber boards fixed to battens or directly to a frame, standing in front of whatever the structure actually is. On older buildings here that structure is frequently timber frame with lath or brick infill.
It sheds water by overlap rather than by being sealed, and it depends on two things to survive: being able to move, and being able to dry. Every mistake made around boarding is a failure of one of those.
Timber moves, and the cladding is designed for it
The property that governs everything else here.
Boards take up and give off moisture with the seasons and move across their width as they do. The overlap accommodates that movement, which is precisely why boarding laps rather than butts.
Anything that restrains the movement causes a split. A board face fixed at both edges, a bead of mastic run along a lap, or a rigid new detail hard against a board end will all do it, and none of them shows for a season or two.
Never seal a lap
The specific instruction that follows, and it is worth stating alone because it is done constantly.
When a rooflight job brings a new detail up against boarding, the temptation is to seal the junction. It looks tidy, it stops a draught, and it traps water on the wrong side of a cladding that was working perfectly well.
The detail is lapped, dressed or flashed so that water is shed. Nothing is sealed shut against a board, and where a previous repair has done so it is worth removing rather than adding to.
| Detail | Wrong answer | Right answer |
|---|---|---|
| Junction with new work | Sealed with mastic | Lapped or dressed |
| Insulation from inside | Packed to the boards | Cavity carried past |
| Fixing a board | Fixed along both edges | Fixed to allow movement |
| A replacement board | Primed on the face | Primed all faces and ends |
| Matching | Nearest available size | Profile, width and lap matched |
| Finish | Whatever is in the van | What the elevation carries |
The ventilated cavity
The second thing keeping boarding alive, and it is easy to close off without noticing.
Boarding on battens has a gap behind it that lets the back of each board dry. Insulation pushed in from inside during a conversion, or a rooflight reveal built tight against the wall, will block it.
Where a new insulation line meets a boarded wall, the cavity is carried past rather than stopped into. It is invisible once done and it decides whether the boards rot from behind over twenty years.
Priming all faces
The detail that decides how long a replacement board lasts, and it is the commonest shortcut on any boarded building.
A new board is primed on its face, its back, both edges and both cut ends before it goes up. An unprimed back takes up moisture from the cavity, and the board cups and splits within a few seasons.
Boards also vary in profile, width and lap between buildings and sometimes within one elevation, so a replacement is matched in profile as well as dimension rather than bought to the nearest size.

Tarred boarding
A finish specific to the working buildings here and it wants treating on its own terms.
Traditional tarred boarding on barns and outbuildings is a maintenance finish rather than a decorative one, renewed periodically over the life of the building. It is not modern black paint and it does not behave like it.
Where a boarded elevation is disturbed, the made good area is finished to match what is there, and the household is told roughly when the elevation is next due.
Scaffolding against a clad elevation
The general point, that cladding of any kind is not a tie substrate, is set out on the West Chiltington page and it applies here in full.
What differs is the consequence. A cracked hung tile is replaced and forgotten. A split board admits water behind the cladding along its whole length until it is repaired, and the frame behind it is what gets wet in the meantime.
Boarded outbuildings
Common here, and frequently the building somebody actually wants the rooflight in.
Cartsheds, stores and stables clad in boarding, converted to workshops, offices and annexes. The roofs are agricultural rather than domestic and the cladding is generally original.
A good number are curtilage listed even where nothing about them looks it. What that means is on the Thakeham page, where converted agricultural buildings are the dominant condition.
The crossroads
The shape of the village, and it decides access on most jobs in the core.
Two main roads meet at the centre and the older buildings sit tight to both. That means traffic on two sides, limited stopping, and a scaffold on a highway busier than a village street ought to be.
A licence here carries conditions about sightlines and footway width, and it is a real negotiation rather than a formality. It is arranged in advance and priced as its own line.
Deliveries at a busy junction
The practical version of the same problem.
A lorry with a made to size unit cannot stand at the crossroads for half an hour. Deliveries are arranged for an agreed early window and the unit goes straight in rather than waiting on a verge.
Where a property fronts directly onto one of the roads, the route in is through the building, and the size that will pass along a hall is measured rather than estimated.
Vibration, and recording what is already there
A local point worth raising and it is not a scare.
Buildings that have stood beside heavy traffic for decades frequently have existing cracking in plaster and settlement in the fabric. That is pre-existing, and it is worth recording before anybody cuts into a ceiling.
Photographs take five minutes and they remove an argument nobody wants to have afterwards.
What the Cowfold stock asks for
Three other conditions apply across the older stock and each is set out in full elsewhere.
Timber frames under the older roofs are on the Steyning page. Hand made clay tile is on Sussex clay peg tile. Lath and plaster ceilings are on West Tarring.
Each is established at survey and none of them is what makes a job here distinctive.

The designation
A village conservation area over the older core, with listed buildings within it.
What it protects is a particular character: boarded and tile hung elevations, clay tile roofs, and a small grain of building around a junction. A standard flanged unit on a visible slope is out of keeping with all of it.
How designation narrows permitted development is on article 2(3) land and permitted development.
Listed buildings
Present in the core, and consent is required for any roof alteration regardless of visibility.
What actually helps such an application is on the Arundel page. What is specific here is the cladding: a proposal that requires disturbing an original boarded elevation to get a scaffold up is materially different from one that does not.
Resolving the access before the application rather than after is worth doing, because an officer will ask.
The Charterhouse, and the buildings out of the village
The monastery and its associated buildings sit apart from the village in every sense: institutional in scale, with their own constraints.
Those are surveyed individually rather than against anything on this page. We mention it because people ask, and because the spire is what most people picture when the village is named.
Frame exposed inside a converted building
A condition common in the boarded outbuildings here and it changes the whole detail.
Where a conversion has left the frame and the underside of the roof on show, there is no ceiling void and no plasterboard. A rooflight reveal is formed in the thickness of the roof build up and every part of it is visible from the room.
That is joinery as much as roofing, and it is priced accordingly. It is also the situation where getting the insulation line right matters most, because the frame of the unit is in full view when it runs with water.
The scattered parish
Beyond the crossroads the parish is farmland, hamlets and individual properties on lanes.
Access there is generally easy: room to stand a scaffold, no licence and no neighbour to negotiate with. What it brings instead is unmade tracks that change completely between summer and winter.
The route is driven at survey, and gates are closed behind us, which on a working farm matters more than it sounds.
Wealden shelter
The environmental position, and it is comfortable.
Well inland with the Downs between the village and the coast, so the salt question does not arise and standard architectural coatings hold up over a normal service life. Wind loading is ordinary.
We will specify standard where standard is right rather than adding a grade the position does not need.

Damp behind a board, and how it shows inside
Worth knowing, because it is the symptom that brings people to look at their cladding.
Water getting behind boarding does not appear as a drip. It appears as a damp patch on an internal wall, frequently some distance below and to one side of where it entered, and it is easily mistaken for rising damp or a plumbing fault.
Where we see that pattern near a roof junction we will say so, because a rooflight job is a good opportunity to find the cause while a scaffold is already up.
What the survey establishes
- Whether any elevation is boarded, and how it is fixed.
- Whether the ventilated cavity behind it is still open.
- Whether any lap has been sealed by an earlier repair.
- What finish the elevation carries, and when it was last done.
- Whether the building is listed, including by curtilage.
- How a scaffold and a delivery will work at the junction.
Building Control
A replacement into an existing opening is not normally notifiable, though the unit still has to meet the limiting thermal standard. A new opening is, and goes to Horsham District Council or an approved inspector.
The thresholds are on do flat rooflights need Building Control.
Permitted development
Outside the designated core most rooflight work falls within permitted development, subject to the projection limit above the plane of the roof and nothing forward of the principal elevation.
In the core those rights are narrowed, and on a listed building the question does not arise because consent is needed regardless. Which applies to a specific address is established before a unit is specified.
How we quote
A free indicative range by email from photographs, then a survey, then a fixed itemised written price that does not move afterwards. Anything we misjudge at survey is ours to absorb.
What is measured at each step is on the how we price and quote page.
Guarantee
Ten years on our workmanship, on every job, limits written down. The manufacturer stands behind the unit; we stand behind the kerb, the flashing and the making good.
The terms, and the accreditations we do not claim, are on the our guarantee page.
Skylight services in this area
Conservation Rooflight Installation
Read moreElectric and Opening Rooflight Installation
Read moreEnergy Efficient Rooflights
Read moreFlat Roof Rooflight Installation
Read moreReplacing a Failed or Misted Rooflight
Read moreRoof Lantern Installation
Read moreRoof Window Installation
Read moreSun Tunnel Installation
Read moreVELUX Window Installation
Read moreWalk-On Rooflight Installation
Read moreThinking about this job? We survey across Worthing, West Sussex and the South Downs and give you a fixed price before any work starts, with a 10-year workmanship guarantee.