Usually not on its own, because a lantern normally sits on a single storey rear extension, and it is that extension whose permitted development limits are the thing being tested. Where the extension is permitted development, a lantern on it generally is too. What changes the answer is a designated area, a listed building, or a lantern that pushes the height beyond what is allowed.

The tests for a rooflight

Projection beyond the roof plane, height against the ridge and which elevation, set out on do flat roof rooflights need planning permission.

What follows is what is different about a structure that deliberately stands proud.

Why the extension is the real question

Because that is where the limits bite.

A single storey rear extension has limits on depth, on eaves height and on overall height, and a lantern sitting on its roof forms part of the height of the whole thing.

So the extension design and the lantern are considered together.

The height limit on a rear extension

The number that most often decides it.

Where an extension is close to the permitted height, a lantern standing above the roof can take the total past it, and the design is adjusted before it is built rather than after.

Reducing the height

Two ways, and both are ordinary.

A shallower pitch lowers the ridge on the same plan, and a lower kerb reduces the base height, though the kerb has a minimum for weathering reasons.

The minimum is on how high should a rooflight kerb be.

The boundary

Relevant where an extension runs close to it.

Height limits are tighter within two metres of a boundary, which on a narrow plot can be the constraint on the whole design rather than on the lantern alone.

A lantern on an existing roof

The case where it is assessed on its own.

Where an extension already exists and a lantern is being added, the rooflight rules on projection and height apply directly, and a lantern projects more than a flat rooflight does.

It is worth a check with the authority rather than an assumption.

Interior of an empty kitchen extension looking up into a large roof lantern, glazing bars and ridge running away from the camera, flat white ceiling and plain plastered walls
Front and side elevations

Front and side elevations

Rarely relevant, and worth knowing anyway.

Lanterns almost always go on rear extensions, and a lantern on a roof visible from a highway at the front is a different conversation.

Conservation areas

Where an application becomes likely.

A structure standing above a roof in a conservation area attracts more attention than a flush pane, and permitted development rights can be restricted.

The general position is on do I need permission for a rooflight in a conservation area.

Listed buildings

A separate consent regardless.

Listed building consent is needed for works affecting the character of a listed building, and a glazed structure on a rear addition is exactly the sort of thing it covers.

That is on do I need listed building consent for a rooflight.

The National Park

Its own authority, across a large part of our area.

Permitted development rights are restricted within the South Downs National Park, and the answer for a village there differs from a Worthing suburb.

Which authority applies is on who is the planning authority in the South Downs National Park.

Article 4 directions

The thing to check rather than assume.

An authority can withdraw permitted development rights over a defined area, and where it has, an application is needed for work that would otherwise be permitted.

A flat or a maisonette

Different rights entirely. Permitted development for extensions and roof alterations applies to houses, and a flat does not have the same rights, so an application is generally needed.

Overlooking

The concern neighbours raise, and it has an answer.

A lantern looks upward at the sky rather than sideways into a garden, so it rarely creates the overlooking that a first floor window would.

Where it is raised, the sight lines are worth drawing rather than arguing about.

Close detail of the ridge of an aluminium roof lantern from below, glazing bars converging, slim dark frame against a bright overcast Channel sky
Light to a neighbour

Light to a neighbour

A separate consideration and occasionally a real one.

A structure standing above a roof close to a boundary can affect a neighbour’s light, and that is a matter the authority weighs where an application is made.

Lawful development certificates

Worth having where a sale is foreseeable.

Where work is permitted development, an authority can confirm that formally, which is a document a buyer’s solicitor is content with.

Building regulations are separate

And they almost always apply. Structure, thermal performance and glazed area are building regulations questions, and they engage even where planning does not.

Those are on do roof lanterns need building regulations approval.

Where the extension itself needs permission

The commonest reason an application is being made at all.

Extensions beyond the permitted depth, or on a property where rights have been removed, need consent in their own right, and the lantern is simply part of the drawing at that point.

It rarely adds anything to the assessment.

The prior approval route

Relevant to deeper rear extensions. A larger single storey rear extension can be possible under a prior approval procedure, where the authority notifies neighbours and considers their responses before confirming.

A lantern forms part of what is described in that submission.

What a drawing should show

The height above the existing roof, marked.

An elevation showing the ridge of the lantern relative to the extension roof and to the house is what an officer actually looks at, and it removes most of the uncertainty.

What we look for on a lantern

We look at the whole extension height rather than the lantern alone, because on a rear extension close to a limit the lantern is what takes the design over it.

The whole picture is on the roof lantern installation page.

Thinking about this job? We survey across Worthing, West Sussex and the South Downs and give you a fixed price before any work starts, with a 10-year workmanship guarantee.

Get a fixed quote

Get a fixed quote

Tell us about the roof. We will tell you the price.

A survey costs you nothing and there is no obligation attached to it. We look at the roof build-up, the exposure and the opening, and give you one fixed figure, not an estimate that moves once work starts.

If your rooflight is leaking now, say so and we will prioritise the survey.

  • Fixed price, confirmed in writing
  • 10-year workmanship guarantee
  • Installed to current Building Regulations
  • Your roof is never left open overnight
Call Get a fixed quote