Do flat roof rooflights and skylights need planning permission?
Usually not. A rooflight in the flat roof of a rear extension is generally permitted development, subject to the projection limit and the rule about the principal elevation. What changes the answer is designated land, a flat rather than a house, a listed building, or a condition removing the rights on a newer estate.
The projection limit
The first test, and on a flat roof it is generous.
A rooflight must not project more than 150 millimetres above the plane of the existing roof. On a flat deck that plane is horizontal, and a unit on a modest kerb can exceed it.
What it measures is on what is the 150mm rule.
Whether a kerb counts
The question people ask, and the answer is that the finished installation is measured.
The height is measured from the plane of the existing roof to the highest point of the completed unit, which includes whatever it stands on.
A tall upstand plus a unit can therefore exceed the limit where the same unit on a low kerb would not.
Where a new kerb is being built
The case worth thinking about at design stage.
Where an extension is being built and the kerb formed as part of it, the plane of the existing roof is the new roof, so the measurement is from that.
Which is generally straightforward, and it is worth confirming rather than assuming.
The principal elevation
The second test, and on a rear extension it rarely bites.
Development must not extend beyond a wall forming the principal elevation and fronting a highway. A rooflight in a rear extension roof is comfortably behind that.
On a side extension visible from a road it is worth checking.
Designated land
Where the answer changes for a rooflight on a slope.
On article 2(3) land there is no permitted development right for a rooflight on a roof slope fronting a highway. A flat roof at the rear is not that slope.
The mechanism is on what is article 2(3) land.

Listed buildings
Where permitted development is the wrong question entirely.
Consent is required for any alteration affecting the character of a listed building, including one on a flat roofed rear addition, and it is separate from planning.
The position is on do I need listed building consent for a rooflight.
Flats
The situation that catches leaseholders out.
Permitted development rights attach to a dwellinghouse, which does not include a flat, so an application is frequently needed on a flat where the same unit on a house would need none.
The lease question is separate and generally larger.
Conditions on a newer estate
The one owners are most often unaware of.
Permitted development rights are frequently removed by condition when a large estate is approved, so alterations needing no application elsewhere need one there.
It is recorded on the original estate consent rather than anywhere obvious, and it is worth checking.
Whether the extension itself was authorised
A question worth asking before adding to it.
Where a rear extension was built without permission or without building control, that is a separate matter, and it surfaces during a sale rather than during the rooflight work.
It is better raised at survey than left.
Lanterns
The product most likely to exceed the projection limit.
A pitched glazed structure on a kerb stands well above the plane of a flat roof and will generally not be permitted development on projection alone.
On a new extension it is usually consented with the extension, and it is worth confirming rather than assuming.
Roof terraces
Where a flat roof job genuinely does need permission.
Making a flat roof accessible as a terrace raises overlooking, which is a planning matter, and it is a different proposition from a rooflight.
The rooflight in it may be permitted; the terrace is not.
Replacements
The easiest case in the tier.
Replacing a unit in an existing opening, not projecting materially further than what came out, is generally not development at all.
The one to watch is a modern insulated unit on a raised kerb standing higher than the thin dome it replaces.

How to check an address
Four checks, minutes each, and all public record.
Whether the property is in a conservation area or National Park, whether it is listed, whether an article 4 direction applies, and whether an estate consent removed the rights.
A lawful development certificate
Worth considering where somebody wants certainty.
An application for a certificate confirms formally that a proposal is permitted development, which is useful evidence at a future sale.
It is optional, it has a fee, and on a straightforward rear extension rooflight most people do without it.
Building Control is separate
And it applies whether or not planning does.
Forming a new opening is notifiable work regardless of the planning position, and the detail is on do flat rooflights need building control.
Neighbour consultation
Not engaged by a rooflight, and worth saying because people worry about it.
The prior approval process that applies to larger single storey rear extensions is about the extension itself rather than about glazing in its roof.
A rooflight in an existing extension roof does not trigger it.
Where a side elevation is involved
The one case on a house where the answer can change.
A flat roof on a side extension visible from a road sits closer to the principal elevation question, and where designation applies as well it is worth checking rather than assuming the rear rules carry across.
What we run on a flat roof
We run the four checks before quoting on any address, measure the projection against the actual installation rather than a product sheet, and say where no application is needed at all.
The whole picture is on the flat roof rooflight installation page.