Electric and Opening Rooflight Installation

Wiring an opening rooflight or skylight into a lighting circuit

A powered rooflight needs a supply, and the question that arrives first is whether the lighting circuit already in the ceiling will do. Frequently it will, and there are several reasons it might not, and the difference is worth establishing before the ceiling closes.

What the unit actually needs

Most domestic rooflight actuators do not run on mains voltage directly. They run at low voltage from a transformer or a control unit, which is what takes the mains supply.

So the supply being discussed is a supply to that control unit rather than to the motor. Where the control unit sits, and what runs between it and the window, are two separate cable questions with two different answers.

Getting that distinction clear early avoids the common error of running a single cable to the window and discovering the controller wanted to be somewhere else.

Low voltage between controller and motor

The run from the control unit to the actuator is low voltage, and that is the cable that has to reach the head of the frame.

Low voltage does not mean it can be run carelessly. It has a maximum length before voltage drop starts to affect how the motor performs, and manufacturers state that figure. A controller placed a long way from the window, at the other end of a large roof, can exceed it.

Where the run is long, the answer is usually to move the controller closer rather than to increase the cable size, and it is another reason the controller position is decided at design.

Whether a lighting circuit will do

Taking a supply from a lighting circuit
Consideration Usually fine Needs thought
Load One actuator, intermittent, small Several units, or an AOV system
Switching The circuit stays live at the ceiling rose Where the supply is switched by the light switch
Isolation A local isolator is provided Nothing local, so the whole circuit goes off
Circuit condition Modern circuit with protective conductors throughout Old wiring with no earth at the switch
Availability Permanent live at the point needed Only a switched live is available

The switched live problem

This is the one that catches people, and it is easy to miss until the unit is installed.

A rooflight controller needs a permanent supply, because it has to respond to a remote, a wall control or a rain sensor at any time. If the only supply available at the ceiling is switched by the room’s light switch, the controller loses power whenever the lights are off.

What that produces is a rooflight that only works when the light is on, and a rain sensor that is asleep at night. It is a wiring arrangement problem rather than a product fault, and it is entirely avoidable by taking a permanent live.

A wall mounted rocker switch beside the reveal of an opening rooflight in a plain kitchen, seen close in flat daylight
Load, and why it is rarely the issue

Load, and why it is rarely the issue

A single domestic rooflight actuator draws very little, and only for the few seconds it is moving.

Compared with the lighting on a circuit it is a small addition, and on a modern circuit it is not usually a difficulty. Where load does become a consideration is a roof with several powered units on one controller, or a smoke ventilation system, which has its own supply requirements.

The electrician assesses that against the actual circuit rather than in principle, which is why the answer is established on site.

A fused connection unit

The common arrangement is a switched fused connection unit supplying the controller, taken from a suitable circuit.

It gives local protection sized for the appliance, and it gives the local isolation that a service visit needs. Where the manufacturer specifies a particular fuse rating, that is the rating fitted rather than whatever is in the box.

It is a small component and it is the difference between an installation that can be worked on and one where the answer to every fault is to turn off the whole circuit.

Isolation, and reaching it

A powered unit has to be isolatable for servicing, and the isolator has to be somewhere a person can actually get to.

An isolator inside a ceiling void above a finished room is not reachable, and it turns every future service visit into taking a ceiling down. Above a plasterboard ceiling with no access hatch is the same problem in a different form.

Somewhere accessible, labelled, and known about. It costs nothing at the time and it is one of the things that quietly separates a considered installation from a completed one.

Part P, and notification

Electrical work in a dwelling falls under Part P of the Building Regulations, and some of it is notifiable.

Whether a particular job is notifiable depends on what is being done and where. Adding a new circuit is notifiable; some work in special locations is notifiable; other alterations to existing circuits may not be. The person doing the electrical work establishes which applies.

Where it is notifiable, it is either notified through a registered competent person scheme or to Building Control, and a certificate follows. That certificate is a document worth keeping with the rest of the paperwork.

Who does what

The division of work is worth stating plainly, because it is a frequent source of confusion on site.

The rooflight installer forms the opening, fits the unit, mounts the actuator and the sensor, and brings the low voltage cable to where the controller will be. The electrician provides and terminates the mains supply, fits the fused connection unit and the isolator, and certifies the electrical work.

The join between them is the controller position and the supply arrangement, and agreeing that before either party starts is the whole of a smooth job.

The cable run from an electric rooflight actuator dressed along the side of a rafter and into a ceiling void, insulation packed either side
Sequence on a building project

Sequence on a building project

  1. Decide the controller position and the supply arrangement at design, before first fix.
  2. First fix: mains cable to the controller position, low voltage cable to the head of the opening, both left with tails.
  3. Seal the cable penetrations through the vapour control layer and any fire compartment.
  4. Rooflight fitted, actuator and sensor mounted, low voltage cable terminated.
  5. Second fix: controller, fused connection unit and isolator fitted and connected.
  6. Commission the system, test the sensor, and demonstrate the controls.

Sealing the penetration

A cable passing through the ceiling into the roof build-up is a hole in the vapour control layer, and holes are how moist air gets into a roof.

It is a small detail, it takes a moment with the right tape or grommet, and it is unreachable afterwards. On a warm deck it belongs in the same conversation as the insulation collar.

Where the cable also crosses a fire resisting floor or ceiling, the penetration has to be made good so the compartment still performs, which is a separate requirement with its own remedy.

Where the controller goes

The controller is a box that has to live somewhere, and where it lives is decided too late on most jobs.

It needs a mains supply, it needs to be within the stated cable run of the actuator, and it needs to be accessible for setting up, for pairing a remote and for any future fault. Those three between them rule out the place it usually ends up, which is buried in the ceiling void above a finished room because that was where the cable happened to be.

A cupboard, an accessible service void, or a position above a hatch are all workable. What matters is that somebody can reach it in five years without a plasterer.

Remotes, pairing and what happens when one is lost

Most powered units come with a handheld remote, and remotes are lost.

A replacement has to be paired with the controller, and pairing generally requires physical access to the controller to put it into a learning mode. Which is the practical reason the accessibility point above matters: a lost remote should be a ten minute problem rather than a ceiling coming down.

A wall mounted control alongside the light switch avoids the issue entirely, and it is what most households end up using day to day even where a remote is also provided. Running a cable to a back box for one, while the ceiling is open, costs almost nothing.

Solar, where none of this applies

A solar powered unit takes no supply at all, so the whole of this page is avoided.

That is the reason it exists as a product, and on a retrofit into a finished room it is almost always the right answer. The comparison across the three ways of powering a rooflight is set out on the manual, electric and solar page.

Marine grade stainless steel fixings and a coated aluminium frame section laid out on a roof membrane before installation, salt haze in the air
Retrofitting a supply

Retrofitting a supply

Where a mains unit is wanted in a finished room, the honest options are limited.

Boards up in the room above where there is one. Chasing the plaster and making good. A surface run in trunking, which works and is visible for ever. Or accepting a solar unit instead.

We set those out plainly rather than starting work and discovering which one the room will tolerate.

Labelling, for whoever comes next

In fifteen years somebody will be looking at a fused connection unit in a cupboard wondering what it feeds.

Labelling the isolator, the fused connection unit and the controller costs a few minutes and a pen. Without it, the usual outcome is that a future electrician turns it off to find out, or leaves it alone because nobody knows, and a rooflight controller quietly loses its supply during unrelated work.

The same applies to the paperwork. The electrical certificate, the controller model, the remote pairing instructions and the fuse rating all belong together with the rooflight documentation rather than in three different drawers.

Adding a second unit later

Where one powered rooflight is going in now and another might follow, the supply is worth sizing and positioning for both.

Many controllers will drive more than one actuator, so a second unit added later can frequently share the existing controller and supply rather than needing its own. Whether yours will is a question about the specific controller and it is worth asking at the outset rather than assuming.

Where it will, leaving the second low voltage run in place while the ceiling is open makes the future job a morning. Where it will not, knowing that now is better than discovering it when the second unit arrives.

Commissioning, and being shown how it works

A powered rooflight is handed over working, demonstrated, and with the controls explained.

That means the remote paired, any wall control operating, the rain sensor tested with actual water, the travel limits confirmed at both ends, and the manual override demonstrated where the unit has one.

It sounds obvious. A system left with a remote in a box and nobody shown the override is a system whose owner disables the sensor in the first wet spring.

What we agree first

We agree the controller position and the supply arrangement before first fix, bring the low voltage cable to the head of the opening and seal the penetration, and coordinate with the electrician rather than improvising a connection. We insist on a permanent live rather than a switched one, put the isolator somewhere reachable, and commission the system with the sensor tested and the controls demonstrated.

The wiring is somebody else’s trade. Agreeing where it goes is ours.

Thinking about this job? We survey across Worthing, West Sussex and the South Downs and give you a fixed price before any work starts, with a 10-year workmanship guarantee.

Get a fixed quote

Get a fixed quote

Tell us about the roof. We will tell you the price.

A survey costs you nothing and there is no obligation attached to it. We look at the roof build-up, the exposure and the opening, and give you one fixed figure, not an estimate that moves once work starts.

If your rooflight is leaking now, say so and we will prioritise the survey.

  • Fixed price, confirmed in writing
  • 10-year workmanship guarantee
  • Installed to current Building Regulations
  • Your roof is never left open overnight
Call Get a fixed quote