Rooflight and Skylight Installation in Bognor Regis
- Fixed quote before we start
- Roof never left open overnight
- 10-year workmanship guarantee
- Fixed quote before we start
- 10 years workmanship guarantee
- 25 years fitting rooflights
- Skylights only, not a general roofer
Bognor’s seafront and the streets behind it are largely rendered, painted and repainted over a century and a half, and render is the material that most often causes trouble on a job here. It hides what is behind it, it fails in ways that are invisible until something is fixed into it, and it shows every repair. This page is what that means in practice.
What we install in Bognor Regis
Replacement work and flat roof rooflights, across a stock that runs from Regency seafront terraces to post-war estates.
The seafront work is the demanding half: exposed, rendered, frequently divided into flats, and frequently in a designation. The estates behind are ordinary work in an ordinary position.
What render actually is
Worth describing, because it is treated as the wall and it is a coating on one.
Render is a coat of mortar applied to a wall face, painted or finished, standing between the weather and whatever the wall is made of. On a building of this age that wall may be brick, it may be brick with a rubble core, and it may not be uniform along its length.
Which means the elevation tells you nothing about what is behind it. Two adjacent houses in one terrace can be built differently under identical render.
Why that matters to a scaffold
Because a tie has to go into something, and nobody knows what that something is until it is opened.
A tie drilled through render into what turns out to be a soft core, or into a rubble filled wall, does not hold. And a tie that does hold cracks the render around it as it loads.
So ties are placed after establishing what is actually behind the face at that point, rather than at a standard spacing, and where the wall is uncertain a box tie through an opening puts no fixing into it at all.
| What you see | What it may be | What we do |
|---|---|---|
| Sound painted render | Anything | Establish before fixing |
| Hairline crazing | Paint film, usually harmless | Note it, photograph it |
| A hollow sound | Render debonded from the wall | No tie there |
| Cracking in a line | Movement, or a lintel | Record before work |
| Blown patches | Water behind, frost damage | Cut out and rebuild |
| Cement over lime | An unhelpful earlier repair | Work around it |
Debonded render, and the hollow test
The check that takes two minutes and saves a great deal.
Render that has lost its bond with the wall behind sounds hollow when tapped, and it can look entirely sound while doing so. It holds no fixing at all and it comes away in sheets when disturbed.
Tapping the elevation where ties are proposed is a standard part of a survey here. Where an area sounds hollow, nothing goes into it and the scaffold is arranged differently.
Cement render on an older wall
An earlier repair that causes problems, and it is common on this stock.
A hard cement render applied over a wall built to breathe traps moisture behind it. The wall stays damp, the render eventually blows off in patches, and each patch takes some of the face with it.
Where we find it, we work around it rather than through it, and we say what we have seen. It is not our work to put right and it is worth an owner knowing about.
Making good, and matching a finish
The visible part, and on a painted terrace it is what people judge the job by.
A tie hole made good in render has to match the surrounding texture as well as be filled, and then be painted to match a colour that has weathered. A flat patch on a textured elevation reads from the pavement.
It is a small piece of work and it is the last thing anybody sees. We would rather take the extra half hour than leave a row of grey discs across a painted front.

Working around a season
A resort town condition that affects scheduling rather than the work.
A great many of these seafront properties are guest houses, holiday flats or businesses that make their year between spring and autumn. A scaffold across a frontage in August is not a scaffold across a frontage in February.
Which means the work is planned around the season where a property is in that trade, generally in the winter, and it is worth asking rather than assuming a household is free.
Winter working, and what it costs
The consequence of the above, and it is worth being straight about.
Winter is when the weather stops roof work, so a job scheduled then will lose more days than the same job in June. It is not more expensive; it takes longer in calendar terms.
An opening is never left unweathered overnight, whatever the reason for stopping, and on a winter job the temporary weathering arrangement is planned rather than improvised.
Seafront exposure
Full, with the Channel in front and nothing between.
Salt arrives continuously on a southerly and works on coatings, fixings and ironmongery rather than on glass. Marine grade and stainless are the baseline on the front and for several streets behind it.
Further inland the exposure falls away and standard coatings hold up. It is judged at the plot, and we will specify standard where standard is right.
Rendered walls in a salt environment
The two conditions interacting, and it is worth naming.
Salt in a wall crystallises as it dries and the pressure of those crystals pushes render off its background. It is a slow mechanism and it is why seafront render fails in patches rather than evenly.
Which means a rendered seafront elevation is more likely to be debonded than a comparable one inland, and the hollow test matters more here than anywhere.
The conservation areas
Two of them, over the seafront core and around Hotham Park, covering the town’s better Regency and Victorian stock.
Inside them the assessment is the ordinary one: what reads from the street and the promenade. Slim flush units on anything visible, rear slopes treated more straightforwardly.
How designation narrows permitted development is on article 2(3) land and permitted development.
Flats above and behind
A large share of the seafront stock is divided, and it changes the sequence entirely.
The roof is generally retained by the freeholder rather than demised with a top floor lease, so consent comes before planning rather than after. What a managing agent will want, and in what order, is on the Littlehampton page.
On a guest house in single ownership none of that arises, and those are among the more straightforward jobs on the front.

Slate on the older roofs
The covering on much of the Victorian stock.
Brittle, nailed rather than hung, and not to be walked on, so opening one means scaffold and matching salvaged slate rather than new.
The detail is on roof windows on a slate roof.
Parapets on the seafront terraces
Present on a number of these buildings and worth identifying early.
Where a terrace has a parapet with a gutter behind it, the roof is hidden from the street and drains through a small number of outlets that must not be obstructed.
What that arrangement allows and what must not be touched is on the Hove page, where it is the dominant condition. It applies here wherever the form is found.
Lime render on the earliest terraces
A distinction that decides how a repair is made on the oldest stock.
The Regency and early Victorian terraces here were rendered in lime, which is softer than the wall behind it, permeable, and able to move slightly without cracking. Later repairs are frequently in cement, which is none of those things.
Where an elevation is still in lime, making good is done in lime to match. Patching a lime render with cement puts a hard inflexible island in a soft field, and it fails at its edges within a few years.
Painted finishes and what they hide
The other layer, and it complicates the survey.
A century of paint builds up into a film that can be holding a failing render together, and stripping or disturbing it in one place occasionally reveals how little is behind it elsewhere.
Which is a reason to keep disturbance to the minimum and to plan tie positions carefully rather than adding a few extra for comfort. On these elevations every fixing has a cost beyond its own hole.
The estates behind
Most of the town by area, laid out from the fifties onward.
Trussed rafters, concrete interlocking tile, and rear extensions with flat decks. Widths between members, the right flashing kit for the profile, and a kerb measured rather than assumed.
The three guides are trussed rafters, flashing kits and roof coverings and what is a builders kerb.
Butterfly roofs behind the parapets
A form found on a number of the older terraces here and it is worth identifying.
Two shallow slopes falling inward to a central valley gutter, hidden behind a parapet at the front. It sheds a large roof area into one channel, and that channel is entirely dependent on staying clear.
A unit can go on either slope where there is room, and nothing goes near the valley. The falls are traced with a level before a position is agreed, because on a butterfly roof there is very little margin.
Access on the front
Harder than it looks on a wide promenade.
These buildings come to the pavement, they are four and five storeys, and there is no side access. A scaffold stands on the highway, which is a licence with conditions and a date.
Through the summer those conditions are tighter, because the footway is busy. It is arranged well in advance and priced as its own line.

Access on the estates
The complete opposite, and worth saying so.
Drives, side gates, wide roads and space beside the house. A tower stands beside a single storey rear extension without a licence or a road closure.
Which makes an estate job here one of the more straightforward installations in the district, and the price reflects that rather than carrying an access allowance it does not need.
What the survey establishes
- What is behind the render, at the points a tie is proposed.
- Whether any area of render is debonded, by tapping it.
- Whether the property is in a designation, and whether it is divided.
- Whether the roof has a parapet gutter.
- The covering, and whether matching slate can be sourced.
- Whether the property trades seasonally, and when work suits it.
Building Control
A replacement into an existing opening is not normally notifiable, though the unit still has to meet the limiting thermal standard. A new opening is, and goes to Arun District Council or an approved inspector.
The thresholds are on do flat rooflights need Building Control.
Permitted development
On the estates most work is permitted development, subject to the projection limit above the plane of the roof and nothing forward of the principal elevation.
Inside the designations those rights are narrowed, and on a flat they do not attach in the way they do to a house. Which position an address is in is established before a unit is specified.
How we quote
A free indicative range by email from photographs, then a survey, then a fixed itemised written price that does not move afterwards. Anything we misjudge at survey is ours to absorb.
What is measured at each step is on the how we price and quote page.
Guarantee
Ten years on our workmanship, on every job, limits written down. The manufacturer stands behind the unit; we stand behind the kerb, the flashing and the making good.
The terms, and the accreditations we do not claim, are on the our guarantee page.
Skylight services in this area
Conservation Rooflight Installation
Read moreElectric and Opening Rooflight Installation
Read moreEnergy Efficient Rooflights
Read moreFlat Roof Rooflight Installation
Read moreReplacing a Failed or Misted Rooflight
Read moreRoof Lantern Installation
Read moreRoof Window Installation
Read moreSun Tunnel Installation
Read moreVELUX Window Installation
Read moreWalk-On Rooflight Installation
Read moreThinking about this job? We survey across Worthing, West Sussex and the South Downs and give you a fixed price before any work starts, with a 10-year workmanship guarantee.