We publish no prices, and we can be specific about what moves the number. On a conservation job the unit is rarely the largest line. The covering it goes into, the weathering detail that covering needs, the access, and the consent process together usually cost more than the rooflight does.
The unit itself
More than a standard rooflight of the same size, and predictably so.
A steel framed slim section unit in modest production volumes costs more than a mass produced aluminium one. That difference is real and it is the part people expect.
It is also the part that varies least. Two conservation units of the same size cost broadly the same wherever they are going.
The covering, which varies enormously
The largest variable, and it is decided by what is on the roof rather than by anything we choose.
A slim unit set into machine made plain tile is straightforward. Into hand made tile with a varying gauge it is careful work with soakers dressed to the actual courses. Into Horsham stone it is specialist roofing with a dressed lead detail and no standard kit at all.
What a stone slab roof involves is on Horsham stone slab roofs, and it is the single largest cost step in this tier.
Leadwork
The line that surprises people on a heritage roof.
Where no preformed kit fits, the weathering is made up in lead by hand, worked to the courses as laid. It is a skilled trade, it takes a day rather than an hour, and there are not many people doing it well.
It is priced as its own line rather than folded into the labour, because on some roofs it is a third of the job.
Getting to the roof in How much does a conservation rooflight cost?
The second largest variable, and it has nothing to do with the rooflight.
A scaffold within a boundary is a modest cost. A scaffold on a highway is a licence, a date and conditions. On a narrow village street with no side access, reaching the back of a building can cost more than the unit.
It is established at survey and quoted separately so it is visible rather than absorbed.

Consent
A real cost on a listed building, and it is worth budgeting for.
An application has a fee where one applies, drawings have to be produced, and a heritage statement is generally needed. On a significant building, pre-application advice is chargeable and frequently worth having.
What that process involves is on how long does listed building consent take.
Making good inside
Frequently underestimated on an old building. Lath and plaster does not cut cleanly and cracks well beyond the opening if unsupported, so making good is a plastering job rather than a filling job. In a room with an ornate or historic ceiling it is more again.
What we find when the roof is open
The line that cannot be priced in advance, and we say so rather than pretending otherwise.
A rafter foot decayed at the wall plate, a purlin end soft, an earlier repair that has failed. None of it is visible from the loft floor.
We price the known work and state clearly what would be extra if the substrate is bad, rather than quoting a firm number that does not survive the first hour.
Why two quotes can differ so much
Worth understanding before comparing them. A quote that assumes a preformed flashing kit on a roof that needs dressed lead is a cheaper quote for a different and worse job. A quote that excludes access, or assumes the scaffold is somebody else’s problem, is not comparable either.
What is included is the question rather than the total, and we itemise so that it can be asked.
Where the money is well spent
The parts that decide whether the job is still sound in twenty years.
The weathering detail, the fixings, and the making good at the frame. Those are invisible when finished and they are what fails when they are skimped.
The unit is the visible part and the least likely to be the problem.

Where it is not
Equally worth saying.
A conservation unit on a slope nobody can see is money spent on an appearance requirement that does not apply. Marine grade coatings well inland do nothing. A larger unit than the pitch or the proportion of the roof will carry looks wrong and costs more.
We will say where a specification is not earning its place.
Two smaller units against one larger
A choice that affects the total and usually in the direction people do not expect.
Two modest units frequently cost less to manufacture than one of the same combined area, because unit price rises faster than size on a made to order product.
They also suit the proportions of an old roof better and light a room more evenly, which makes it one of the rare decisions that is cheaper and better at the same time.
When we suggest waiting
Where the honest answer is that the money is better spent later.
If a roof is due to be stripped and relaid within a couple of years, a rooflight fitted during that work is a fraction of the cost of one cut into a finished covering, because the tiles are off and the scaffold is up.
We will say so, and lose the job now, because it is obviously right.
What a range at enquiry can and cannot do
Worth setting expectations, because a photograph hides the things that cost money.
A photograph shows a covering and an approximate slope. It does not show a rafter foot, a purlin position, the condition of an underlay, or whether a scaffold can stand within a boundary.
So an emailed range is honest about being a range. The survey is where the number becomes fixed.
How a price is arrived at
A free indicative range by email from photographs, then a survey, then a fixed itemised written price that does not move afterwards.
What is measured at each step is on the how we price and quote page.
Thinking about this job? We survey across Worthing, West Sussex and the South Downs and give you a fixed price before any work starts, with a 10-year workmanship guarantee.