Horsham stone slab roofs, and why no standard kit fits one
Horsham stone is the roofing material of the Sussex Weald, and it is the one covering in our area where the standard approach to a roof window simply does not apply. This page explains why, and what is done instead.
What Horsham stone is
It is a sandstone from the Weald Clay, quarried around Horsham and used across the Weald and up onto the edge of the Downs for centuries. It splits into thick flat slabs, and those slabs were laid as roofing on churches, farmhouses, barns and cottages from the medieval period onward.
It is not slate and it does not behave like slate. A slate is thin, uniform and light. A Horsham slab is thick, heavy, irregular in outline, and varies in thickness within a single roof.
Graded courses
The most distinctive feature of a stone slab roof is that the courses are graded: the largest, heaviest slabs at the eaves and progressively smaller ones toward the ridge.
There are good reasons for it. The largest slabs are the heaviest and they sit lowest, where the structure is best able to carry them. The gauge, meaning the exposed height of each course, changes continuously up the roof as a result.
That grading is why no repeating flashing detail works. A flashing kit assumes a constant gauge and a constant thickness, and a stone roof has neither.
The weight, which decides the structure
A stone slab roof is several times the weight of a modern tiled roof per square metre, and the structure underneath was built for that specific load.
The rafters and purlins are heavier than in a tiled roof and the whole assembly is frequently oak, several hundred years old, and no longer straight. It has taken up a set over centuries, and it is carrying the load it was built for in a way that has proven itself over a very long time.
Cutting into that structure is not a matter of trimming between rafters as one would on a modern roof, and it is not something to do without understanding what is being cut.
How the slabs are fixed
Traditionally on oak pegs through a hole in the head of each slab, hung over riven battens. The peg carries the slab, the slab overlaps the two courses below, and the whole roof is held by gravity and by lap rather than by fixings resisting uplift.
Later work used nails, and repairs over the years have used all sorts. Understanding which is present matters, because taking slabs off a pegged roof and putting them back is a different operation from doing the same on a nailed one.

Why no standard kit fits
| A kit assumes | A Horsham stone roof has | Consequence |
|---|---|---|
| Constant course gauge | Graded courses, gauge changing up the slope | Soakers cannot be sized to a repeating course |
| Constant material thickness | Slabs varying within one roof | The flashing sits proud on some courses and low on others |
| Straight, regular edges | Irregular riven outlines | No clean line for a side flashing to follow |
| A flat plane | An old roof that has taken a set | The frame does not sit true to the covering |
| Light units, easily lifted | Heavy slabs, fragile at the peg hole | Opening up and reinstating is skilled work |
What is done instead
The junction is made in lead, dressed on site to the actual slabs, in the traditional way.
Soakers are cut and dressed to the individual courses as they are met, rather than taken from a set of identical pieces. The head and side details are formed to suit what is actually there. The lead is dressed over and under the slabs in the correct laps, and the whole junction is made by hand.
That is leadwork, it takes a skilled leadworker, and it takes longer than fitting a kit. It is also the only method that works, and it is what these roofs have always used at chimneys and valleys.
Which unit suits a stone roof
A standard roof window standing proud of the covering looks wrong on a stone slab roof, and on a visible slope in the Weald it will usually be refused.
A conservation rooflight, sitting nearly flush with the covering, with a slim frame and a single central glazing bar, is the product that suits. On a roof of this thickness the unit sits deeper than it would on slate, which helps rather than hinders the flush appearance.
Cast iron frames were the historic version of this and pressed steel is the modern equivalent. Both read correctly on a stone roof in a way an aluminium framed roof window does not.
Where these roofs are
Within our radius the concentration is in the Weald and along the scarp: Horsham district and the villages around it, Steyning, Bramber, Upper Beeding, Henfield, Cowfold, Partridge Green, West Chiltington, Thakeham, Storrington and up onto the Downs edge.
Many of those villages sit inside the South Downs National Park, which means the National Park Authority is the planning authority rather than the district council. A good number of the buildings are also listed, and a stone slab roof is frequently one of the things that got them listed.

Listed buildings, which is the common case
Where the building is listed, listed building consent is required and it is assessed on merit rather than granted as a matter of course.
The roof covering on a building like this is frequently the most significant surviving historic fabric on it, which means the case for putting a hole in it has to be made rather than assumed. A rear or concealed slope, a small flush unit, reversible work and reused slabs are what makes that case.
Pre-application advice is worth more here than almost anywhere, because the officer will tell you which slope they could accept before anybody has spent anything.
Reuse, and why nothing goes in a skip
Every slab that comes off goes back on, and this is not negotiable on a roof of this kind.
New Horsham stone is available in small quantities and it is expensive, and it does not match a weathered roof for a very long time. Reclaimed stone is the usual source for making up shortfalls, and it is scarce.
Slabs are lifted carefully because the peg hole is the weak point and a slab that breaks there is a slab lost. They are stacked on edge rather than flat, kept in course order where possible, and put back around the opening so the roof reads as it did.
The structure, and cutting into old oak
Forming an opening in a medieval or post-medieval roof structure is a different proposition from trimming between modern rafters.
The members are irregular, they may be original, and cutting one is frequently a loss of historic fabric in its own right on a listed building. The load paths were established over centuries and are not necessarily what a drawing would predict.
The right approach is to fit between the existing members wherever possible, which constrains the size of the unit to what the rafter spacing allows, and to involve a structural engineer familiar with historic timber where anything has to be cut.
Telling Horsham stone from the alternatives
Not every stone roof in the Weald is Horsham stone, and it is worth knowing what you are looking at before anybody quotes for work on it.
- Horsham stone. Sandstone, buff to grey brown, thick, riven with an irregular outline, graded courses. Local to the Weald Clay.
- Welsh or Westmorland slate. Thin, uniform, regular, usually darker. Imported by rail from the Victorian period onward and common in the towns rather than the villages.
- Reconstituted stone slate. Cast concrete made to look like stone. Regular in thickness and outline, and it takes a standard flat covering kit.
- Stone slate from elsewhere. Occasionally a roof has been repaired with Purbeck or Cotswold stone, which behaves similarly and matches poorly.
The reliable tells are grading and irregularity. If the courses reduce in size up the slope and no two slabs are quite the same shape, it is a genuine stone slate roof and everything on this page applies.
Scaffold and access
These buildings are frequently rural, frequently listed, and always awkward to work on.
A stone roof cannot be walked on the way a tiled roof can, because a slab that takes a foot in the wrong place breaks at the peg hole and a broken slab is not easily replaced. That means proper roof access rather than working off the covering, and it means a scaffold on any job of consequence.
Access is therefore a real proportion of the cost on these roofs, and it is another reason to do everything the roof needs while the scaffold is up rather than returning for each item separately.

Moss, lichen and what grows on stone
A stone slab roof carries a substantial growth of moss and lichen, and that growth is part of its appearance and part of what the designation protects.
It also affects a rooflight. Moss holds water against the covering and against any flashing in it, debris washes down and collects at the head of the unit, and lichen on the glass reduces the light.
Cleaning a stone roof aggressively is a bad idea, because it damages the surface of the stone and removes something that took decades to establish. Keeping the head of the rooflight clear is a modest and localised job, and it is the maintenance that matters.
Underlay on an old roof
Many of these roofs have no underlay at all, because they predate it. The covering was the only barrier and it worked by lap and by mass.
Introducing an underlay locally around a rooflight is possible and it needs thought, because a roof with no underlay is ventilated through the covering itself, and a local impermeable layer can trap moisture in old timber that has been drying through the roof for centuries.
Where an underlay is introduced it should be vapour permeable, and the decision belongs with somebody who understands the building rather than with a standard detail.
What it costs, in time rather than money
We publish no prices, and the shape of this one is worth describing because it surprises people.
The unit is a small part of it. The work is opening up carefully, setting aside and protecting the slabs, forming the opening within the existing structure, dressing lead to individual courses, and reinstating the covering by hand. It is a skilled job measured in days rather than hours, and the consent process runs alongside it.
Against that, it is done once and the roof is good for another century.
What we do
On a Horsham stone roof we survey the structure and the covering before saying anything about a product, establish whether the building is listed and which authority applies, and specify a flush conservation unit weathered in dressed lead rather than a kit. We set aside and reuse every slab, fit between the existing structure wherever we can, and get pre-application advice before anything is ordered.
A stone roof is not a difficult version of a tiled one. It is a different building, and it is treated as one.