Areas We Cover

Rooflight and Skylight Installation in Hurstpierpoint

  • Fixed quote before we start
  • Roof never left open overnight
  • 10-year workmanship guarantee
Skylight installation on a home in Rooflight and Skylight Installation in Hurstpierpoint, flat overcast daylight
  • Fixed quote before we start
  • 10 years workmanship guarantee
  • 25 years fitting rooflights
  • Skylights only, not a general roofer

Hurstpierpoint is essentially one street. The designated area runs the length of the High Street with listed buildings along most of it, and behind each frontage a long narrow plot runs back. That arrangement gives an unusually clean answer to the question every conservation job asks, and it creates a practical problem that is harder than the planning one.

What we install in Hurstpierpoint

Conservation rooflights, and the great majority of them go into rear slopes.

The front of a building on this street faces a designated High Street with a high concentration of listed buildings. The back faces a long private plot with another long private plot beyond it.

Which means the usual difficulty, working out what is genuinely visible, is unusually straightforward here. Getting to the slope is the difficult part.

Burgage plots, and why they matter

The medieval land division that still shapes the village, and it is worth explaining.

The street was laid out with narrow frontages and long plots running back from each one, which is why the buildings are tight together at the road and the gardens are long and thin behind.

For a rooflight that produces two things. Rear slopes that are genuinely unseen from any public place, which is a strong planning position. And no side access whatever between one building and the next, which is a genuine practical problem.

Front and back on a burgage plot
The street frontage The rear slope
Public visibility Complete Effectively none
Planning position Difficult Usually arguable
Unit required Slim flush, if anything Slim flush by preference
Access Highway scaffold Through the building, or a long way
Structure Original, frequently framed Often a later addition
Where our work goes Rarely Almost always

Getting to the back

The problem that decides how a job here runs, and it takes more arranging than the consent does.

With buildings meeting at the party wall along the whole frontage, there is frequently no route from the street to a rear garden except through the building itself. Scaffold components, a made to size unit and every bag of debris go through somebody’s hallway.

Where a neighbour has an access that could be used, that is a conversation and a written agreement rather than an assumption. Both are settled at survey, and access is priced as its own line.

Rear additions, which are the answer

The first thing we look for on any building on this street.

Most of these properties have a later addition at the back, frequently nineteenth or twentieth century and of no particular historic interest. A rooflight in that roof is a far easier proposition than one in the original slope.

It is not historic fabric, it is not visible, and it lights the room people actually use. It answers a good number of enquiries that would otherwise have been difficult.

Listed buildings, and what consent asks

Common here rather than exceptional, given the concentration along the street.

On a listed building any alteration to the roof needs listed building consent regardless of visibility, and invisibility is an argument in favour rather than an exemption. The application is still made.

What helps it: a rear or later slope, a slim flush unit, no historic timber cut, and reversibility. Those four carry more weight than any argument about daylight.

A post war housing estate of semi detached houses with concrete interlocking tile roofs at a uniform pitch, seen along the street
What the fabric asks for, in short

What the fabric asks for, in short

Four conditions apply to most buildings on this street, and each is set out in full elsewhere rather than repeated here.

Timber frames under the older roofs, and why an opening in one is a carpentry decision, is on the Steyning page. Hand made clay tile and its varying gauge is on Sussex clay peg tile. Tile hanging on the elevations is on West Chiltington. Lath and plaster ceilings, and why making good is a plastering job, is on West Tarring.

All four are established at survey. None of them is peculiar to this village, and none of them is what makes a job here difficult.

The two frontages problem

What is peculiar to this village, and it is the thing that catches architects out.

A burgage plot building frequently has a second frontage: the original street face, and a later face onto a side lane, a yard or a footway that developed as the plot was subdivided.

Which means a slope that is genuinely invisible from the High Street can be entirely visible from a lane behind it, and the assumption that back equals private stops holding. Every route around the building is walked before a position is proposed.

Plot subdivision, and what it left behind

The other consequence of a medieval land pattern surviving into the present.

Long plots were divided and built on repeatedly, so the ground behind a High Street building can contain outbuildings, a converted workshop, a later cottage and a modern garage in a line.

Several of those are curtilage listed even though nothing about them looks it. A rooflight in a converted outbuilding here is a listed building matter more often than not, and it is checked rather than assumed from appearance.

Roof pitch on a later addition

The constraint that most often rules out the obvious answer here.

The rear additions that make such good rooflight positions were frequently built at a shallower pitch than the main roof, and conservation units carry a minimum pitch below which a manufacturer will not warrant them.

What that means in practice is on the Ferring page. Here it is taken with a level at survey, because on this street the shallow addition and the private slope are frequently the same roof.

Party walls along a continuous frontage

An unavoidable consideration where every building shares a wall with the next.

Work close to or on a shared wall, including fixing a kerb against it or cutting into it, can engage the party wall procedure, and on a street built continuously that is most positions near a flank.

It is raised at survey rather than after the notice period would have needed to start, because the timescale runs to weeks and on a listed building it sits alongside the consent rather than instead of it.

Chimney stacks between properties

A specific consequence of shared walls on an old street.

Stacks here frequently sit on the party wall and serve both properties, with flues from each side running through one structure. A position that looks clear from inside one loft can have a neighbour’s flue immediately behind it.

The roof space is looked at before a position is agreed, and where a shared stack is involved the neighbour is told rather than surprised.

A tile hung Sussex farmhouse with a steep clay peg tile roof, mature oaks around it, low cloud over the Weald
Working above a shop or a business

Working above a shop or a business

A situation peculiar to a High Street and worth planning for.

A good number of these buildings have commercial use at ground floor and residential above, with separate occupiers and frequently separate ownership.

That means access through a working business, agreed hours, and a route that does not obstruct a fire escape. It is arranged in advance and it occasionally decides which days the work happens on.

Where the designation boundary actually runs

A question worth answering precisely on a street like this one.

The designated area follows the historic street and its plots rather than a tidy line, which means it can include the back half of one plot and stop short of the next. Properties on the edge are frequently unsure which side of it they sit.

It matters, because it changes whether a rear slope needs an application or not. We establish it from the mapped boundary rather than from what a neighbour was told, and it takes minutes.

A practical constraint that is easy to underestimate.

The High Street carries traffic, parking is limited and timed, and a delivery lorry with a made to size unit cannot simply stand outside for an hour. Nor can a scaffold lorry.

Both are arranged for a window agreed in advance, generally early, and the unit is taken straight through rather than left on the pavement. It sounds like a small thing and it is the difference between a smooth morning and a difficult one.

Cellars, and what they say about the building

A small survey habit worth mentioning on this street.

A number of these buildings have cellars, and a cellar is frequently the clearest evidence of the building’s original extent and its subsequent alterations, which matters when establishing what is historic fabric and what is not.

It also tells you something about how the building has moved over centuries, which in turn tells you what to expect of the roof plane above.

The college, and the buildings out of the village

Hurstpierpoint College and the larger properties around it sit apart from the street in every sense.

Institutional buildings, larger spans, and their own constraints. They are surveyed individually rather than against anything on this page, and access there is generally the easiest part rather than the hardest.

What we are usually replacing

On this street it is rarely a failed unit.

It is generally a standard flanged rooflight fitted twenty or thirty years ago, before designation was taken as seriously, standing proud of a hand made tile slope and visible from somewhere it should not be.

Replacing one of those with a slim flush unit is among the more satisfying jobs we do, and it is frequently welcomed by a conservation officer rather than resisted, because the outcome is an improvement on what is there.

A small inland Sussex market town of brick and tile buildings on a gentle slope, the Downs a low pale line on the southern horizon
Sheltered under the Downs

Sheltered under the Downs

The environmental position, and it is comfortable.

The village sits inland with the scarp between it and the coast, so the salt question does not arise and standard architectural coatings hold up.

Wind off the scarp affects which mornings a roof is workable rather than what goes on it. We will specify standard where standard is right and say so.

What the survey establishes

  • Whether the building is listed, including by curtilage.
  • Whether there is a later rear addition that could take the unit.
  • How materials and debris will actually reach the back.
  • Whether the roof is framed, and where principal timbers run.
  • The pitch of the slope in question, taken with a level.
  • Whether the ground floor is in separate use or ownership.

Building Control

A replacement into an existing opening is not normally notifiable, though the unit still has to meet the limiting thermal standard. A new opening is, and goes to Mid Sussex District Council or an approved inspector.

The thresholds are on do flat rooflights need Building Control.

Permitted development

Inside the designation permitted development rights are narrowed, and on a listed building the question does not arise because consent is required regardless of visibility.

Outside the street the ordinary rules apply, subject to the projection limit above the plane of the roof. Which regime applies to a specific address is established before a unit is specified.

How we quote

A free indicative range by email from photographs, then a survey, then a fixed itemised written price that does not move afterwards. Anything we misjudge at survey is ours to absorb.

What is measured at each step is on the how we price and quote page.

Guarantee

Ten years on our workmanship, on every job, limits written down. The manufacturer stands behind the unit; we stand behind the kerb, the flashing and the making good.

The terms, and the accreditations we do not claim, are on the our guarantee page.

Skylight services in this area

Thinking about this job? We survey across Worthing, West Sussex and the South Downs and give you a fixed price before any work starts, with a 10-year workmanship guarantee.

Get a fixed quote

Questions we get asked here

Do I need planning permission for a rooflight in Hurstpierpoint?

Mid Sussex District Council is the planning authority for Hurstpierpoint, and it is the one to ask rather than the district you might assume. Conservation area over the High Street, many listed. Permitted development here is narrowed; listed consent common. We check the designation and the elevation before anything is specified, because on a designated slope the product follows the planning position rather than the other way round.

What will you find on a Hurstpierpoint roof?

Clay plain tile with tile hanging. Timber frames under cut roofs. Dressed soakers on hand made tile. That is what a survey confirms on your roof rather than assumes from the street.

Does being in Hurstpierpoint change what you would specify?

Under the Downs, sheltered; standard coatings. It is a specification decision taken at order rather than something that can be improved afterwards, which is why we raise it before a unit is chosen.

How would you get to the roof in Hurstpierpoint?

High Street constrained with highway licence; estates easy. Access is the largest single variable between two otherwise identical jobs, so it is settled at survey by standing in the garden rather than judged from a photograph.

Get a fixed quote

Tell us about the roof. We will tell you the price.

A survey costs you nothing and there is no obligation attached to it. We look at the roof build-up, the exposure and the opening, and give you one fixed figure, not an estimate that moves once work starts.

If your rooflight is leaking now, say so and we will prioritise the survey.

  • Fixed price, confirmed in writing
  • 10-year workmanship guarantee
  • Installed to current Building Regulations
  • Your roof is never left open overnight
Call Get a fixed quote