Rooflight and Skylight Installation in Brighton
- Fixed quote before we start
- Roof never left open overnight
- 10-year workmanship guarantee
- Fixed quote before we start
- 10 years workmanship guarantee
- 25 years fitting rooflights
- Skylights only, not a general roofer
Brighton is the hardest place in this radius to put anything on a roof, and it is worth saying so at the outset. The plots are the smallest, the designations are the most extensive, the proportion of buildings in multiple occupation is the highest, and the enforcement is the most active. None of that makes work impossible. It does mean the sequence matters more here than anywhere else.
What we install in Brighton
Conservation rooflights, and listed building consent is common rather than exceptional.
Most enquiries come from a top floor room in a building that is designated, frequently listed, and frequently divided. The unit itself is rarely the difficult part. Establishing who has to agree, in what order, is.
Where a building sits outside the designations, the work is ordinary and the access is still the constraint.
The order things have to happen in
The single most useful thing on this page, because getting it wrong is what costs people months.
Establish the designation and the listing. Establish who owns the roof. Obtain freeholder consent and any licence to alter. Then planning or listed building consent. Then Building Control. Then the work.
Applying for planning before securing freeholder consent is the commonest error, and it wastes a fee and eight weeks. We check the tenure before we discuss a unit.
| Step | Who | Typical hold up |
|---|---|---|
| Designation and listing | Established from the record | Curtilage listing missed |
| Who owns the roof | The lease | Assumed rather than read |
| Freeholder consent | Freeholder or agent | Asked for too late |
| Planning or LBC | The city council | Visible slope, no precedent |
| Building Control | Council or approved inspector | Rarely the problem |
| Access agreement | Neighbours, highway | Left until the week before |
The Lanes, and building at that density
The oldest part of the city and the tightest, with buildings that come to the paving on all sides and alleyways too narrow for a scaffold.
What that means practically is that a roof here is frequently reachable only from inside the building, or from a tower standing in a space that has to be negotiated with somebody else. Occasionally it is not reachable safely at all.
We establish that first, because there is no point specifying a unit for a slope nobody can get to. Where the honest answer is that a roof cannot be worked on safely, we say so.
North Laine
Small terraced cottages at high density, mostly two storeys, with a designation over the whole quarter and very little room anywhere.
The roofs are small, the slopes are short, and a standard unit is a large object on one of them. Proportion matters here more than in any other designated area in the radius: a unit sized for a suburban roof looks wrong on a North Laine cottage even when it is technically permitted.
Smaller units, and frequently two rather than one, are the answer, and they suit the building as well as the assessment.
Mathematical tile
A material almost peculiar to this city and its immediate neighbours, and it needs recognising before anything is disturbed.
Mathematical tiles are hung on a timber frame and pointed so that the elevation reads as brickwork. From the street it is indistinguishable from brick, and a scaffold tie driven into it as if it were brick will destroy a run of it.
It appears on frontages rather than roofs, so it affects the scaffold rather than the covering. Its presence is established by looking at the reveals and the corners rather than at the face, and where it is present, ties go elsewhere.

Buildings in multiple occupation
An unusually large share of the stock here, and it changes several things at once.
The fire strategy of an HMO is a designed thing, and a rooflight in a protected stairway or a ceiling that has a fire resisting function is not a product choice. It is a question for whoever holds the fire risk assessment.
There is also a licensing regime with conditions attached, and alterations can engage them. On a licensed HMO we establish that position before proposing anything, rather than after.
Kemp Town and the bow fronts
The eastern squares and terraces, comparable in protection to the Hove seafront and with the same roof form behind the parapets.
The parapet gutter arrangement, what may go behind it, and what must not touch the lining, is set out on the Hove page, where it is the dominant condition. Everything there applies here.
What differs is the density behind the frontages: the service lanes and mews are tighter, and access is more often through the building.
Slate, and matching it
The covering on almost all of the older stock.
Brittle, nailed rather than hung, not to be walked on, and weathered to a colour new slate does not have. Salvaged slate goes back and breakage is made up from the least visible part of the roof.
The detail is on roof windows on a slate roof.
Precedent, and how much it is worth
More here than anywhere, because the planning record is dense and easy to search.
Where a comparable unit has been approved on a comparable building nearby, that is a material consideration and it is worth putting in the application. On a street of near identical houses it frequently settles the matter.
Equally, where similar proposals have been refused, that is worth knowing before a fee is spent. We look both ways rather than only for the helpful answer.
Article 4 directions
The mechanism worth understanding here, because the city uses it.
An article 4 direction removes permitted development rights that would otherwise apply, over a defined area and for defined kinds of work. Where one is in place, an alteration that would be permitted anywhere else needs an application.
They are recorded and they are checkable, and they do not show up on a casual look at a map. It is one of the first things established for a Brighton address, because it is also one of the easiest to be caught out by.
Curtilage listing
The trap that catches more people here than any other.
A building can be listed without being named on the list, where it forms part of the curtilage of a listed building and predates 1948. Outbuildings, coach houses, mews and rear additions are all commonly caught.
Which means checking the list for an address is not sufficient on its own. What the building is, when it was built and what it sits behind all matter, and it is worth establishing before work is proposed rather than after it has been done.

Enforcement
Worth being plain about, because it affects advice.
Unauthorised work on a designated or listed building in this city is pursued, and the remedy is removal and reinstatement at the owner’s cost. On a listed building it is also a criminal matter.
Which is why we will not fit a unit on a listed roof without consent, whatever the circumstances, and why we say so early rather than at the point somebody has made plans.
Seafront exposure
Direct, with nothing in front of it, along the whole southern edge of the city.
Salt arrives continuously on a southerly and works on coatings, fixings and ironmongery rather than on glass. Marine grade and stainless are the baseline near the front.
The city climbs steeply behind, and exposure falls away with height and distance in a way it does not on a flat coast. It is judged at the plot rather than by postcode.
Scaffold, licences and a busy city
The practical constraint that shapes every price here.
No side access, buildings to the pavement, and highways that are busy, narrow and frequently pedestrianised or loading restricted. A scaffold licence is a date and a set of conditions and sometimes a refusal for a particular position.
Where a street is pedestrian only, delivery and erection happen in a window agreed in advance. All of it is established at survey and priced as its own line.
Working through an occupied building
Frequently the only route, and it is slower than a house with a side gate.
Materials in and debris out through a communal stair and other people’s landings, on agreed days, with the route sheeted. Other occupiers are told in advance rather than meeting a scaffold on the morning.
In a licensed building there may also be conditions about obstructing escape routes, which are checked rather than assumed.
The hills, and what they do to a view of a roof
A consideration peculiar to a city built up the sides of a valley.
Roofs here are seen from above, from the streets climbing behind them and from the open Downs at the top. A slope that is invisible from its own road can be fully in view from a road two hundred metres away and thirty metres higher.
Which means the assessment of what is visible is done on foot from uphill rather than from the pavement outside, and it occasionally reverses the obvious answer about which slope to use.
Roof terraces, and what people actually want
A frequent Brighton enquiry that starts as a rooflight question.
Where somebody wants access onto a flat roof as well as light into the room below, that is a walk-on unit or an access hatch rather than a rooflight, and it is a substantially different product with a structural question attached.
It also raises overlooking, which in this density is the consideration most likely to attract objections. Both are worth separating from the daylight question early, because one of them is achievable far more often than the other.

Small rooms, and choosing the position
The judgement that matters most on this stock.
These are compact plans and one unit in the right place changes more than two in the wrong ones. A landing or the head of a stair frequently earns it more than a bedroom, because the light reaches everything opening off it.
It is worth walking the top floor before deciding, because the room somebody arrived wanting to light is often not the one that changes how the flat feels.
What the survey establishes
- The designation, the listing, and whether curtilage listing applies.
- Who owns the roof, and what the lease requires.
- Whether the building is a licensed HMO, and what its fire strategy says.
- Whether the elevation is mathematical tile rather than brick.
- Whether the roof can be reached safely at all.
- What the planning record shows for comparable buildings nearby.
Building Control
A new opening is notifiable, so we notify Brighton and Hove City Council or an approved inspector and the completion certificate comes back to you. Keep it. It is what a solicitor asks for when the house is sold.
Where the line falls between a new opening and a replacement is on do flat rooflights need Building Control.
Permitted development
Inside the designations, permitted development rights are narrowed, and on a flat they do not attach in the way they do to a house. On a listed building the question does not arise, because consent is needed regardless.
Between those three, a very large share of Brighton addresses need an application of some kind. Establishing which, at the outset, is the difference between a job that takes three months and one that takes nine.
How we quote
A free indicative range by email from photographs, then a survey, then a fixed itemised written price that does not move afterwards. Anything we misjudge at survey is ours to absorb.
What is measured at each step is on the how we price and quote page.
Guarantee
Ten years on our workmanship, on every job, limits written down. The manufacturer stands behind the unit; we stand behind the kerb, the flashing and the making good.
The terms, and the accreditations we do not claim, are on the our guarantee page.
Skylight services in this area
Conservation Rooflight Installation
Read moreElectric and Opening Rooflight Installation
Read moreEnergy Efficient Rooflights
Read moreFlat Roof Rooflight Installation
Read moreReplacing a Failed or Misted Rooflight
Read moreRoof Lantern Installation
Read moreRoof Window Installation
Read moreSun Tunnel Installation
Read moreVELUX Window Installation
Read moreWalk-On Rooflight Installation
Read moreThinking about this job? We survey across Worthing, West Sussex and the South Downs and give you a fixed price before any work starts, with a 10-year workmanship guarantee.