What happens if I fit a rooflight or skylight without consent?
It depends which regime was breached. On a listed building, carrying out works without consent is a criminal offence, there is no time limit that makes it lawful, and the remedy is removal and reinstatement at the owner’s cost. In a conservation area on an unlisted house it is a planning breach, which is a different and less serious matter.
The listed building position
The serious one, and it is worth being unambiguous.
Unauthorised works to a listed building is an offence in itself, prosecutable, and it is not cured by time. A rooflight fitted twenty years ago without consent is still unauthorised today.
Liability attaches to whoever carried out the works and to whoever caused them to be carried out.
The conservation area position
A planning breach rather than an offence, and the practical exposure is different.
Development carried out without required permission is a breach that an authority may serve an enforcement notice on. Complying with that notice is the requirement; ignoring it is where an offence begins.
Time limits
Where the two regimes differ most, and it is frequently misunderstood.
Planning enforcement is subject to time limits after which a breach becomes immune. Listed building consent has no equivalent, so unauthorised works to a listed building never become lawful with age.
Nobody should rely on a period of quiet as though it settled the matter.
How it is actually found
Rarely by an inspector, and reliably at a sale.
A solicitor acting for a buyer asks for the consents and the Building Control certificate. Where they do not exist, the transaction stops until the position is regularised or the buyer accepts it with an indemnity.
That is the moment most people discover the problem, and it is the worst possible one.

Indemnity insurance
Frequently offered and worth understanding for what it is.
An indemnity policy covers a buyer against the financial consequence of enforcement action. It does not make the work lawful, it does not remove the offence, and applying to regularise generally invalidates it.
It is a transaction tool rather than a solution.
Regularising after the event
Possible, and it is a genuine application rather than a formality.
Retrospective listed building consent can be applied for, and it is assessed on the same test as a prospective one: whether the works are acceptable, not whether they have already been done.
Which means a proposal that would have been refused is still refused, and now with the work in place.
What refusal means at that point
Removal and reinstatement, at the owner’s cost, to the authority’s satisfaction.
On a rooflight that means taking the unit out, reinstating the covering and making good the ceiling, using materials the authority accepts.
It costs considerably more than doing it properly the first time.
Building Control is separate again
A third regime, and it catches people who thought they had covered the planning side.
A new opening is notifiable work regardless of consent, and the completion certificate is what a solicitor asks for alongside any planning documents.
Work done without notification can generally be regularised, which is a process with a fee and an inspection.
Why we will not do it
The position, and it is not negotiable.
We will not fit a unit on a listed roof without consent, whatever the circumstances and however sympathetic the proposal. Saying so early is fairer than saying it late.
What an installer’s position is
Worth knowing if somebody else has offered.
Liability for unauthorised works to a listed building is not confined to the owner. A contractor who carries them out is exposed too, which is a reasonable question to ask anybody willing to proceed without consent.

If it has already happened
The sensible order, and it is worth taking advice early.
Establish what regime applies, take conservation advice on whether the work would have been acceptable, and approach the authority rather than waiting to be found.
An owner who comes forward is in a materially better position than one discovered.
What a certificate of lawfulness does
A useful instrument in the planning regime and not in the listed one.
Where development is immune from enforcement through the passage of time, a certificate of lawful existing use or development records that formally, which is what a solicitor wants to see.
It applies to planning breaches. It does nothing about unauthorised works to a listed building, because those never become lawful.
The Building Control side
Worth separating again, because it is the one most often overlooked.
A regularisation application asks Building Control to inspect and certify work already carried out. It is available, it has a fee, and it frequently requires opening up so an inspector can see what is behind a finish.
On a rooflight that can mean disturbing the very detail somebody was hoping to leave alone.
Where the previous owner did it
Common, and unfair, and it is still the current owner’s problem.
The obligation to remedy attaches to the building and therefore to whoever owns it, regardless of who carried out the work.
It is one more reason to establish the position before buying rather than afterwards.
What gets checked on a designated roof
We check the listing and the designation before quoting, and where we find existing unauthorised work we say so rather than fitting alongside it.
What consent actually requires is on do I need listed building consent for a rooflight.